Grafton Waste Water Treatment Plant
-
Date Completed:August 31, 2014
-
Category:
-
Location:Grafton, OH
Firm’s Responsibility: General Contractor
Cost: $3,200,000.00
Scope: Phase 1 consisted of replacing the existing UV system, replacing/enlarging tertiary filter piping and distribution system, fine screen replacement and screen chamber modifications.
Phase 2 consisted of massive earthwork to construct a 5.1 million gallon concrete-lined EQ basin.
Phase 3 was full depth removal and reconstruction of the entrance road.
Self-Performed Services: Process piping, earthwork, utilities, EQ basin, general construction