Mt. Vernon Nazarene University – Engineering Building

Firm’s Responsibility:  General Contractor

Cost:  $679,485

Scope:   A complete renovation/alteration of an existing building located in downtown Mt. Vernon. The structure was constructed in 1958 of Type 2B steel and concrete construction. The newly renovated building is for the educational uses for the Dept. of Engineering at MVNU. The scope included the demolition of existing HVAC & Electrical systems, elevator cab and all mechanical components, existing storefront, as well as various interior ceilings and partitions  for new code compliant systems, new classrooms, demonstration and shop fabrication labs, study areas, offices and restrooms. 2 floors above grade and 1 floor below grade – less than 5,000 SF per floor.

Self-Performed Services:

  1. Selective demolition
  2. Miscellaneous structural steel
  3. Concrete slab infill/repair
  4. Exterior finish carpentry
  5. Metal stud partitions
  6. Metal frames
  7. Doors & hardware
  8. Acoustical ceilings

Contact Us

Please enable JavaScript in your browser to complete this form.
Thank you for your interest in Simonson Construction. To begin a conversation with us, please fill out the form below or call us at (419) 281-8299. Our main office is located at: 2112 Troy Rd., Ashland, Ohio 44805 View A Map »
Name