Village of Killbuck – Water Treatment Plant
-
Date Completed:March 30, 2012
-
Category:
-
Location:Killbuck, OH
Firm’s Responsibility: General Contractor
Cost: $1,500,000.00
Scope: This project consisted of 2 contracts, A & B. Contract A was for a new 252,000 GPD water treatment plant which included site work, plumbing, electrical, and HVAC. Contract B consisted of the water and sanitary lines of approx. 2,550 ft. of 8” raw and finished water lines, approx. 1,000 ft. of 6” distribution water lines, approx. 1,600 ft. of 8” sanitary sewer and 350 water meters including appurtenances.
Water treatment equipment included two (2) Tonka pressure filters, chemical feed system, air blower and mag meters all tied together with ductile iron process piping and valving.
Self-Performed Services: Site work, excavation, concrete foundations/poured walls, water treatment plank equipment and process piping, site utilities, water lines and meter pits